terça-feira, 14 de novembro de 2017

TOOL: PlanITpoker - Online Scrum planning poker for Agile project teams

An alternative to the use of "planning poker card decks" (or installing some kind of mobile app for that purpose, on every development team member mobile phone - not everyone may have a smartphone handy for planning) a web tool could be used for estimation:
Quoting:
"Pure & Simple Planning
Make Estimating Agile Projects Accurate & Fun
Estimate Like An Expert
Sprint Plan Effortlessly
Play Online Anywhere"


quarta-feira, 21 de junho de 2017

Estimation: PERT / Three Point Estimation Technique

The estimation technique in Agile is Planning Poker.
As for Waterfall, a combination of decomposition (WBS), PERT / 3 point estimation (weights sum up 6) and iterative reevaluation could be used.
What is exactly the 3 point estimation and PERT? Google says:
Quoting Tech Republic:
"PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate.

  • The most pessimistic (P) case when everything goes wrong [also called "Worst Case Scenario"]
  • The most optimistic (O) case where everything goes right [also called "Best Case Scenario"]
  • The most likely (M) case given normal problems and opportunities [also called "Expected Case Scenario"]

The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values. You'll notice that the final PERT estimate is moved slightly toward either the optimistic or pessimistic value - depending on which one is furthest from the most likely. Generally this ends up moving the final estimate toward the worst case, since the worst case value tends to be further out from the most likely that the optimistic number."

Some tools (like MS Project) will allow you to do some What If scenarios, by defining different weights  (above the weights are 1, 4, 1, and all weights should sum up to 6). What if it is most probable that mostly everything goes wrong (could be tested with weights like 1, 1, 4). What if mostly everything goes right (4, 1, 1)?


sexta-feira, 19 de maio de 2017

Standards: Automated Enhancement Points (AEP) standard (CISQ)

The Automated Enhancement Points (AEP) Standard details and uses:
http://it-cisq.org/standards/automated-enhancement-points/

Quoting:
"Automated Enhancement Points is a standard measure of software size to be used in productivity analysis and the sizing of software maintenance activities. As of October 2016, the specification is an official standard of the Object Management Group® (OMG®).
The Automated Enhancement Points specification was published after the Automated Function Point (AFP)standard written by CISQ in 2013. Automated Enhancement Points improves the measurement of software size for use in productivity analysis by measuring both the functional and non-functional size of software. This is a significant advance in automated software sizing that solves problems that functional size measures have experienced in analyzing productivity during maintenance and enhancement activities.
With these two standards [AFP and AEP] for function point analysis and software sizing, organizations can:
- perform software quality and productivity analysis
- enable users to determine the ROI of an application by sizing the functionality that specifically matches the requirements of their organizations
- calibrate estimating methods against the results of past estimates
- measure and manage contracts and agreements with system integrators and outsourcers
- normalize data used in software benchmarks
- determine the size of a purchased application package (COTS or customized system) by sizing all the code included in the package"

The standard can found here: http://www.omg.org/spec/AEP/

Also make sure to read about the AFP and AQCS standards (also from CISQ).

quinta-feira, 28 de julho de 2016

Estimation Process and related artifacts

Your QMS could include a process on estimation (that presents the estimation techniques and the associated activities to be executed in order to produce the final estimation sheets that are input for ROMs, Proposals, Change Requests, ...).

One example (INTERNAL):


Some common artifacts include templates and models to help you estimating (INTERNAL, use the QMS Portal with the doc id enclosed in double quotes):

  • Estimation form (template): CSW-QMS-2011-TPL-02102-estimation-sum-up.xls (now a xltx)
  • Planning Poker form (template): CSW-QMS-2015-TPL-02398-planning-poker-estimation.xltx
  • Effort Per Phase Model: CSW-QMS-2009-DOC-04974-effort-model-2014-baseline-data4all.xlsx
  • Safety Critical Estimation Model: CSW-QMS-2014-DOC-01296-asd-estimation-model.xlsx
  • Estimation @ CRITICAL Software - Study on the Estimation Process for CRITICAL Software Projects: CSW-ESTIMATE-2009-PCS-00707-estimation-process.doc
PS. If you're interested in estimation models, google for them. They are very dependent on the business you're working on although there are some attempts to generalize them.